Match the resin to the recorded NaOH concentration and temperature, choose a bund-grade traction finish, seal every cut edge, isolate fixings from steel, and close the RFQ with pooling and offload-cycle detail; suitability for the recorded conditions is confirmed by project review.
- Concentrated caustic does not match a moisture polyester automatically; vinyl ester or epoxy are reviewed for the strongest splash, warmth, mist or pooled wetting once the 50% NaOH concentration and temperature are recorded.
- Pultruded I-bar follows apron and bund perimeter runs; molded 38 mm panels follow drains, valves and tank surrounds. Span, hose access.
- Grip for operator pads where feet stay damp; concave dished sections shed runoff on bund edges, and smooth mesh stays off the caustic splash line. Site-cut panels are diamond-sawn and edge-sealed before exposure, since an open cut admits caustic to the glass.
How this article differs: This page covers the concentrated caustic bund duty and procurement inputs; it does not re-derive load tables, concentrated-load checks or resin chemistry, which are handled in the dedicated reference articles.
1. Site Conditions and Duty
Fifty percent sodium hydroxide is a concentrated caustic moved through tanker offload bays, storage tank bunds and dosing stations. Grating in this zone takes splash when hoses connect or disconnect, drips from valve glands and couplings, and caustic runoff that crosses the bund floor toward the drain. The deck is wet around offload cycles and dry between them; residue can crystallise on bar faces after rinsing, and alkali mist may settle where the liquor is agitated or warmed. Walking traffic and occasional hose handling dominate; there is usually no continuous immersion in the grating itself.
Concentrated caustic attacks resin families through saponification and matrix swelling, so a moisture-resistant polyester is not an automatic match for 50% NaOH. The grade must be reviewed against the recorded concentration and temperature, with tougher vinyl ester or epoxy families considered for the strongest splash, warmth or pooled wetting. Fibres are shielded only while the resin cover and edge seal stay intact; an unsealed cut lets caustic enter the laminate and undercut from the sawn side, where inspection is harder.
2. Build-up, Resin and Surface Selection
| Location | Exposure mode | Duty | Suggested build-up | Resin / surface note |
|---|---|---|---|---|
| Tanker offload apron | Caustic splash, hose drips, runoff | Connection and operator rounds | Pultruded 38 mm I-bar | Resin per recorded NaOH; grit top |
| Tank bund floor | Intermittent wetting, crystallised residue | Walking around tank perimeter | Molded 38 mm 38×38 | Matched family; concave shed |
| Drain / sump cover | Runoff film, pooled rinse | Cover over collection channel | Pultruded 38 mm T-bar | Sealed edge; impervious finish |
| Dosing valve ledge | Gland drips and light mist | Standing inspection reach | Molded 38 mm 50×50 | Grip finish on wet footing |
- Concentrated caustic does not match a moisture polyester automatically; vinyl ester or epoxy are reviewed for the strongest splash, warmth, mist or pooled wetting once the 50% NaOH concentration and temperature are recorded.
- Pultruded I-bar follows apron and bund perimeter runs; molded 38 mm panels follow drains, valves and tank surrounds. Span, hose access.
- Grip for operator pads where feet stay damp; concave dished sections shed runoff on bund edges, and smooth mesh stays off the caustic splash line. Site-cut panels are diamond-sawn and edge-sealed before exposure, since an open cut admits caustic to the glass.
3. Installation and Bearing Details
- Survey apron bearers and bund ledges for level, crystallised scale and bearing width before dry-fitting; an uneven seat traps caustic film at panel edges.
- Bed sections on the 3 mm neoprene isolation strip over steel, keeping end and side gaps from the node detail around tank valves and hose connections.
- Secure each bar at every bearer and corner with the matching A2-70 M6/M8 clip family; isolate the fixing from dissimilar metal and hand-tighten to setting without over-driving.
- Seal cut edges and drilled holes with matched resin within 24 hours; lift removable covers without prising neighbours, then re-check bearing and clips after the first two weeks of offload service.
- ≥ 50 mm bearing on steel/FRP support; 60 mm preferred at end spans
- 3 mm neoprene strip on steel supports to cut galvanic contact and local stress
- 10–15 mm end gap for thermal movement (~20 mm at long runs)
- 6–10 mm side gap for expansion and safe lifting
- Clips at every support and every corner; C/L/T/W/saddle families; A2-70 M6/M8 bolts
- Hand-tighten plus 1/4 turn; do not over-torque
- Seal any cut edge with matched resin within 24 hours
- Walk the deck and re-torque after 2 weeks of service
4. Routine Inspection and Maintenance
| Task | Frequency | What to check |
|---|---|---|
| Visual inspection | Monthly | Cracked bars, loose clips, edge seal, displaced panels |
| Clip torque check | Quarterly, first year | Hand-tight; re-torque any loose fixing |
| Washdown | As needed | Fresh water, low pressure; no acid or solvent-based cleaner |
| Grit top renewal | As needed | Top up worn traction with matched gritted resin |
| Edge seal check | Annually | Touch up any bare roving before it spreads |
| UV top-coat | Every 3–5 years | Re-coat exposed surface with matched resin on request |
- Walk the apron and bund monthly for softened bars, blistering, loose clips, shifted covers and crystallised residue in corners.
- Check clip torque quarterly in year one; free any seized coupling or gland fitting before it locks under caustic deposit.
- Rinse with fresh water at low pressure; keep reciprocal alkali cleaners and solvents off the resin matrix.
- Renew worn grit with matched gritted resin and touch up exposed roving at edge seals before undercutting spreads along the sump.
5. RFQ Inputs and Procurement Checklist
- State the NaOH concentration range and recorded offload or ambient temperature so resin can be graded against the resistance table.
- Describe exposure: splash during hose work, runoff across the bund, pooled caustic in the sump, and contact duration per offload cycle.
- Give the duty: apron walking, hose connection, bund inspection or equipment reach, and any local load from tools or drums.
- Mark finishes by zone: grit on wet pads, concave on bund edges, smooth on dry sheltered points.
- Cite the governing standard and deflection limit; request the matched deflection report, batch material record and Barcol check with the production papers.
- Governing access standard and project deflection limit are cited with the order.
- Matched resistance note confirms the resin grade against the recorded medium.
- Batch material record and Barcol hardness check accompany the delivered panels.
- Any point, wheel, concentrated or equipment load is referred to engineer review and the matched report.
| Minimum order (MOQ) | 10 m² |
| Standard production | 15–25 working days after drawing approval |
| Overall lead time | 12–36 working days overall |
| Indicative price | USD 15–95/m² |
| Manufacturing history | Founded 2004; 200+ employees; 20,000+ m² plant |
| Export reach | 45+ countries; 541+ customer reviews, 4.9/5 average rating |
6. Compliance and Service Boundaries
7. Frequently Asked Questions
Which resin suits 50% sodium hydroxide on grating?
The grade follows the recorded concentration, temperature and contact type. Polyester is a mild-alkali baseline; vinyl ester or epoxy are considered for concentrated caustic splash, warmth, mist or pooled wetting after checking the resistance reference. Suitability remains a project evaluation, not a blanket claim.
Pultruded or molded on an offload apron?
Pultruded I-bar carries apron and bund perimeter runs with lighter weight; molded 38 mm sections shape cleanly around drains, valves and tank surrounds. The measured span, hose access and fittings decide the mix.
How should a caustic bund floor be finished?
Grit-embedded top for pads where feet stay damp; concave dished sections shed runoff on bund edges; keep smooth panels off the caustic line. Match the mesh opening to site footwear.
How are panels and fixings isolated in a caustic bund?
Sections bed on the 3 mm neoprene strip; matching clips fasten bars to bearers and corners with the fastener isolated from dissimilar metal. Cut edges and holes are sealed within 24 hours; clearances follow the node drawing.
What caustic damage should be reviewed on a bund deck?
Softened or blistered skin, darkening, lifted roving, cracked edge seal or caustic film under clips should be flagged for engineering review; a laminate opened to the glass needs assessment, not a surface coat.