Planning Secondary Framing Spacing Under Grating

Structural Sizing
Direct Answer

coordinating grating panel depth with the spacing of secondary support beams

  • Lay out primary and secondary support lines before selecting grating sections.
  • Treat secondary beam spacing as the panel span for load and deflection checks.
  • Verify each panel bears fully on the secondary beam without unsupported overhang.

1. Scope and Engineering Context

The beams beneath a grating define the panel's real span. Whether these are primary girders or secondary joists, the distance between adjacent support lines acts as the span for load and deflection, so framing spacing and grating depth have to be coordinated early rather than settled one after the other.

A deck plan lays out every support line first, then matches panel depth to that spacing. Seams are placed over beams, each edge is checked for full bearing, and any spacing that falls outside the tabulated range is sent for a separate structural review.

  • secondary framing. The joists or cross-beams carrying panel edges between the main girders; their spacing sets the grating span.
  • beam spacing. Centre-to-centre distance between adjacent beams, the value used to read allowable load and sag.
  • support lines. Each line where a panel rests on framing; edges and joints must land on these lines.
  • panel bearing. The contact a panel makes on a beam, confirmed wide enough to seat the edge without rocking.
  • deck plan. The overall deck arrangement of beams, panels and openings that ties framing and grating together.

2. Worked Example and Site Checklist

The verified uniform-load table covers simply supported spacings of 600, 900 and 1200 mm. At 900 mm, Molded 38 mm allows 12 kN/m² and Pultruded 38 mm allows 18 kN/m²; at 1200 mm those drop to 6.5 and 9 kN/m². A secondary beam grid planned at 1050 mm sits between the 900 and 1200 rows and cannot be read from either; it needs a separate engineered check.

Wider beam spacing saves steel but lowers the grating allowable and raises sag. As a reference, the 6.5 kN/m² Molded 38 mm figure at 1200 mm converts to roughly 136 lb/ft² (6.5 × 20.9); this table value does not extend to an unlisted spacing without calculation.

Check on siteWhat to recordWhy it matters
Plot primary and secondary linesNote each beam centreline and its spacingFraming geometry must be fixed before depth is chosen.
Treat secondary spacing as the panel spanRead load and sag against that distanceThe joist gap, not the panel length, governs the rated row.
Verify full bearing on each beamRecord edge contact and any unsupported overhangAn edge resting on a void loses the support the rating assumes.
Align seams with support linesNote where joints land and how clips seatA seam between beams leaves two panel edges without bearing.
Flag off-range spacingMark any gap beyond 1200 mm or between rowsNon-tabulated spans require an engineer's review.
ItemVerified figure / note
Tabulated spans600 / 900 / 1200 mm, simply supported
Molded 38 mm @ 900 mm12 kN/m² allowable UDL
Pultruded 38 mm @ 1200 mm9 kN/m² allowable UDL
1050 mm gridOutside the tabulated rows; separate check

3. Failure Modes and Cautions

A common false economy spaces secondary beams wider to cut steel weight, then keeps the same grating. The wider gap drops the panel's allowable load and increases sag; the steel saving is offset by a deck that under-performs, because framing and grating were optimized on one side only.

Another fault places a panel seam midway between joists. Both cut edges then hang over the open bay, rocking and deflecting under traffic. The joint belongs over a beam; a mid-span seam is a bearing failure even if the panel section itself looks adequate.

  • Balance steel spacing and grating capacity together; do not optimize one at the other's expense.
  • Confirm every panel edge bears on framing before clips are fixed.
  • Keep the planned spacing, depth and bearing in the deck record for later review.

4. Boundary: When This Does Not Apply

This framing discussion covers preliminary secondary-beam layout under uniform load. It does not cover beam settlement or differential movement, wind-uplift fixing, seismic anchors, cantilevered projections, concentrated wheel loads, or fatigue under repeated traffic; those go to an independent structural assessment.

A spacing outside 600/900/1200 mm should not be assigned a rating by interpolation from the nearest row. Where framing must carry staged equipment or openings, the load case is reviewed separately rather than read off the secondary-span table.

5. Frequently Asked Questions

What spacing does the grating load table use?

The preliminary table covers 600, 900 and 1200 mm simply supported spans; secondary beam spacing should be planned against one of these, or sent for a separate check.

Can secondary beams be spaced farther apart to save steel?

Wider spacing reduces steel but lowers the grating allowable load and raises sag. The two must be balanced together, not optimized on one side alone.

Where should panel seams fall?

Seams should land on a support line so each panel edge has a bearing point; avoid a seam resting between beams.

Does grating depth affect framing design?

Panel depth sets the required support spacing and bearing; the framing layout in turn determines which depth can be used. Coordinate both early in the deck plan.

Who approves secondary framing spacing?

Preliminary spacing can be planned from the table; the structural engineer confirms bearing, deflection and any special duty in the stamped design.

ZEALL Engineer

FRP Grating Technical Team

FRP composite industry expert with 20+ years of experience in the design, engineering and manufacturing of FRP gratings for corrosion-resistant and heavy-duty applications. Published by NANTONG ZEALL NEW MATERIALS CO., LTD.

Published: 2026 |Category: Structural Sizing |Author: FRP Grating Technical Team
Have Questions? Contact Us →
Previous Article
FRP Grating Surface Selection | R13
📞 Contact UsHomeProductsCatalogueApplicationsProjectsMarketsBlog🎬 VideosTools💰 CalculatorAbout

Document Preview

Preview mode · For full document, click Download

Download Document

Thank you for your interest. Please fill in your email and company name. Our technical and sales team will contact you within 30 minutes (during working hours) to provide support!

📧 Your information will be sent to [email protected]. We respect your privacy and will never share your data.

Thank You!

Your request has been received successfully.

Our technical and sales team will contact you within 30 minutes (during working hours) to provide the document and professional support!

If you need urgent assistance, please email: [email protected]