Shims and Leveling When Grating Panels Seat Unevenly

Installation Practice
Direct Answer

Small seat unevenness can be corrected with shims placed under the bearing, but packing must support the panel on its supports rather than bridge gaps or stack up under a raised edge.

  • Identify the low side or corner before placing any packing.
  • Put shims under the bearing line, within the seat width.
  • Recheck flatness and contact after packing; avoid high stacks or floating panels.

1. When a Panel Seats Unevenly

A panel may rock, sit high on one edge or leave a visible gap under a bar end because the support frame is slightly out of level, the seat carries scale or weld beads, or the panel itself has minor dimensional variation. Before reaching for packing, the cause is checked: a twisted stringer or uneven frame should be corrected at the structure, not buried under shims.

Uneven seating matters because a panel bearing on part of its edge carries load through a smaller contact area and can feel loose underfoot. The inspection records which corners or edges are low, the measured gap under the bearing, and whether the frame itself is true along the support line. Packing is then sized to fill only that remaining seat difference.

  • shim. a thin packer placed under a bearing to level the panel.
  • packer. a solid pad or strip supporting the panel on the seat.
  • seat gap. the space between a bar end and its support before packing.
  • floating panel. a panel held by fixings without full bearing on the supports.
  • stack. multiple shims layered to make up a larger unevenness.

2. Shim Types and Placement

Leveling packs for composite decks include flat shim strips, solid bearing pads and adjustable packers placed under the bar ends on the support. They should sit fully on the frame, span the seat width and match the material environment; a shim that hangs past the support or bridges an open channel does not add bearing. Packing is placed where the panel actually bears, not beneath an empty edge.

Where several bar ends sit on one support, shims are distributed to keep the panel level along the line rather than raising one corner. Thin shims can be layered to make up a measured gap, but high stacks are avoided because they can shift, compress or leave the panel sitting on packing instead of the frame. The fixing is fitted after the panel has been checked level.

  • Measure the low side or corner before selecting shim thickness.
  • Place packing within the seat, fully on the support.
  • Distribute shims along the bearing line to keep the panel even.

3. How Much Adjustment Is Appropriate

Shims correct small installation-level differences, not major frame misalignment. A large gap, a support that slopes along its length, or a frame out of plane should be resolved at the steelwork; repeated thick packing indicates a structural adjustment that should be reviewed. The panel should bear on the support with minimal packing once the frame is true.

After packing, the deck is walked and rechecked for rocking, soft spots or edges that lift underfoot. A panel that still moves after reasonable shimming is not forced down by over-tight fixings; the seating or frame condition is revisited. The as-built record notes where shims were used and what packer thickness was installed.

ConditionAppropriate actionAvoid
Small low cornerThin shim under bearingStacking thick packers
Uneven seat scaleClean seat, then pack as neededLeaving debris under panel
Frame out of levelCorrect support structureHiding it under shims
Rocking after packingRevisit seating/frameOver-tightening fixings

4. Worked Leveling Check

As a preliminary illustration, measure a seat gap g = 3 mm under one bar end on a support. A shim of matching thickness is placed under that end to bring the panel level. If the bearing contact after packing spans seat length s = 50 mm and bar width b = 6 mm, the contact area is 300 mm², against which the end reaction is checked in the project review. The gap figure is a measured installation value, not a design allowance.

This check confirms the panel sits flat on its packing; it does not establish panel capacity, frame level tolerance or fixing strength. Where the required packing exceeds reasonable adjustment, or the support itself is distorted, the installation is reviewed by the structural party before the deck is closed in.

InputSymbolIllustrative value
Measured seat gapg3 mm
Seat lengths50 mm
Bar widthb6 mm
Contact areas·b300 mm²

5. Boundary

This note covers shim selection, placement and leveling for panels with minor seat unevenness. It does not establish frame tolerance, structural capacity, deflection limits, anchor design or load rating; those follow a structural review for the installed deck.

Level packing should not be assumed to compensate for an undersized frame, settled support or damaged panel. If the deck later shows ongoing rocking, settlement or soft spots, the bearing condition and frame are reassessed rather than repacked repeatedly.

6. Frequently Asked Questions

When should shims be used under a grating panel?

For small measured seat differences that leave a low corner or edge; major frame misalignment should be corrected at the structure rather than packed out.

Where do leveling shims go?

Under the bar ends on the bearing line, fully within the seat width and on solid support, distributed along the line to keep the panel level.

Are thick shim stacks acceptable?

High stacks are avoided because they can shift, compress or leave the panel on packing; large gaps indicate a frame adjustment that needs review.

How is leveling verified after packing?

Recheck for rocking, soft spots and lifting edges; a panel that still moves is revisited rather than forced down by over-tight fixings.

Does this note set frame level tolerance?

No. Tolerance, capacity and fixing strength require structural review; the shim check is an installation-level seating adjustment.

ZEALL Engineer

FRP Grating Technical Team

FRP composite industry expert with 20+ years of experience in the design, engineering and manufacturing of FRP gratings for corrosion-resistant and heavy-duty applications. Published by NANTONG ZEALL NEW MATERIALS CO., LTD.

Published: 2026 |Category: Installation Practice |Author: FRP Grating Technical Team
Have Questions? Contact Us →
Previous Article
FRP Grating Surface Selection | R13
📞 Contact UsHomeProductsCatalogueApplicationsProjectsMarketsBlog🎬 VideosTools💰 CalculatorAbout

Document Preview

Preview mode · For full document, click Download

Download Document

Thank you for your interest. Please fill in your email and company name. Our technical and sales team will contact you within 30 minutes (during working hours) to provide support!

📧 Your information will be sent to [email protected]. We respect your privacy and will never share your data.

Thank You!

Your request has been received successfully.

Our technical and sales team will contact you within 30 minutes (during working hours) to provide the document and professional support!

If you need urgent assistance, please email: [email protected]