Match the resin to the recorded seawater exposure mode, choose a marine-grade traction finish, seal every cut edge, isolate fixings from dissimilar metal, and supply tide, spray, duty and drainage in the RFQ; immersion or heavy-duty service proceeds only on project engineering review.
- Dry coastal air, spray zone, splash band and periodic immersion are separate conditions; the recorded exposure mode, tide line and spray pattern set the family before the grade is chosen.
- Pultruded sections follow long jetty and perimeter runs with lighter weight; molded 38 mm treads and platform sections shape around valves, intakes and openings. Span, tide clearance.
- Grit top for walkways and treads where spray keeps feet damp; concave dished sections shed runoff on ledges, and smooth mesh is reserved for dry sheltered coastal points. Site-cut edges and holes seal before the panel returns to the splash or tide zone.
How this article differs: This page covers the marine jetty/intake duty and procurement inputs; it does not re-derive load tables, concentrated-load checks or resin chemistry, which are handled in the dedicated reference articles.
1. Site Conditions and Duty
Seawater service covers jetties and quay walkways, cooling-water intake galleries, coastal pump platforms, marinas and splash-zone decks. Grating here meets salt spray in the wind, tidal dampness at the waterline, occasional splash from waves or wash, and humid marine air that carries salt moisture onto bars. Exposure ranges from dry coastal atmosphere to intermittent wetting and, at the lowest treads, periodic immersion during tide or spray events. The deck handles walking rounds, tie-up or intake maintenance and occasional equipment reach.
Seawater is a saline electrolyte rather than a concentrated chemical, but continuous dampness, salt crystallisation and marine atmosphere still test the resin cover and any opened edge. The resin family must be reviewed against the recorded exposure: dry coastal air, spray zone, splash band or periodic immersion are not interchangeable conditions, and the measured tide, spray pattern and water temperature inform the choice. Glass fibre is protected while the resin cover stays intact; an unsealed cut lets saline moisture migrate toward the reinforcement, and dissimilar-metal fixings in the splash band need isolation from contact and salt film.
2. Build-up, Resin and Surface Selection
| Location | Exposure mode | Duty | Suggested build-up | Resin / surface note |
|---|---|---|---|---|
| Jetty / quay walkway | Salt spray, tidal dampness, sea wash | Walking rounds and tie-up work | Pultruded 38 mm I-bar | Moist-service resin; grit top |
| Intake gallery platform | Intermittent wetting, saline air | Pump and valve inspection | Molded 38 mm 38×38 | Matched family; concave shed |
| Splash-band treads | Wave splash, periodic damp | Lower access steps and ledges | Molded 38 mm grit tread | Sealed edge; grip finish |
| Coastal perimeter deck | Humid salt atmosphere | Perimeter walking route | Pultruded 38 mm T-bar | Resin per exposure zone |
- Dry coastal air, spray zone, splash band and periodic immersion are separate conditions; the recorded exposure mode, tide line and spray pattern set the family before the grade is chosen.
- Pultruded sections follow long jetty and perimeter runs with lighter weight; molded 38 mm treads and platform sections shape around valves, intakes and openings. Span, tide clearance.
- Grit top for walkways and treads where spray keeps feet damp; concave dished sections shed runoff on ledges, and smooth mesh is reserved for dry sheltered coastal points. Site-cut edges and holes seal before the panel returns to the splash or tide zone.
3. Installation and Bearing Details
- Survey bearers and jetty supports for level, salt scale and bearing width before dry-fitting; an uneven seat traps saline moisture at panel edges.
- Bed sections on the 3 mm neoprene isolation strip over steel or dissimilar supports, keeping end and side gaps from the node drawing around bollards, valves and intake pipes.
- Secure each bar at every bearer and corner with the matching A2-70 M6/M8 clip family; isolate the fastener from dissimilar metal and hand-tighten to setting without over-driving.
- Seal cut edges and drilled holes within 24 hours; lift removable intake panels without prising neighbours, then re-check bearing and clips after the first two weeks of marine service.
- ≥ 50 mm bearing on steel/FRP support; 60 mm preferred at end spans
- 3 mm neoprene strip on steel supports to cut galvanic contact and local stress
- 10–15 mm end gap for thermal movement (~20 mm at long runs)
- 6–10 mm side gap for expansion and safe lifting
- Clips at every support and every corner; C/L/T/W/saddle families; A2-70 M6/M8 bolts
- Hand-tighten plus 1/4 turn; do not over-torque
- Seal any cut edge with matched resin within 24 hours
- Walk the deck and re-torque after 2 weeks of service
4. Routine Inspection and Maintenance
| Task | Frequency | What to check |
|---|---|---|
| Visual inspection | Monthly | Cracked bars, loose clips, edge seal, displaced panels |
| Clip torque check | Quarterly, first year | Hand-tight; re-torque any loose fixing |
| Washdown | As needed | Fresh water, low pressure; no acid or solvent-based cleaner |
| Grit top renewal | As needed | Top up worn traction with matched gritted resin |
| Edge seal check | Annually | Touch up any bare roving before it spreads |
| UV top-coat | Every 3–5 years | Re-coat exposed surface with matched resin on request |
- Walk the walkway and gallery monthly for dulled bars, salt crystals, loose clips, shifted panels and seal loss in splash corners.
- Check clip torque quarterly in year one; free any seized bollard, valve or fixing before it locks under salt deposit.
- Rinse with fresh water at low pressure to carry salt film away; keep harsh chemical cleaners and solvents off the resin matrix.
- Renew worn grit with matched gritted resin and touch up exposed roving at edges before damp-driven undercutting spreads along the tide line.
5. RFQ Inputs and Procurement Checklist
- State the seawater exposure mode: coastal atmosphere, spray zone, splash band, intermittent tide wetting or periodic immersion, plus recorded salinity and temperature.
- Give the duty: jetty rounds, intake maintenance, tie-up work or equipment reach, and any local load from tools, containers or maintenance equipment.
- Mark finishes by zone: grit on damp walkways and treads, concave on ledges, smooth on dry sheltered points.
- Describe drainage and tide: how long panels remain wet after spray or tide, and whether liquid pools under any stretch of deck.
- Cite the governing standard and deflection limit; request the matched resistance check, deflection report, batch material record and Barcol hardness with the order papers.
- Governing access standard and project deflection limit are cited with the order.
- Matched resistance note confirms the resin grade against the recorded medium.
- Batch material record and Barcol hardness check accompany the delivered panels.
- Any point, wheel, concentrated or equipment load is referred to engineer review and the matched report.
| Minimum order (MOQ) | 10 m² |
| Standard production | 15–25 working days after drawing approval |
| Overall lead time | 12–36 working days overall |
| Indicative price | USD 15–95/m² |
| Manufacturing history | Founded 2004; 200+ employees; 20,000+ m² plant |
| Export reach | 45+ countries; 541+ customer reviews, 4.9/5 average rating |
6. Compliance and Service Boundaries
7. Frequently Asked Questions
Which resin handles seawater on a marine grating deck?
The family is checked against the recorded exposure mode: dry coastal air, spray zone, splash band or periodic immersion are rated separately. The tide line, spray pattern and water temperature inform the choice; submerged duty needs its own project evaluation, not a spray-zone reading.
Pultruded or molded on a jetty walkway?
Pultruded sections follow long jetty and perimeter runs with lighter weight; molded 38 mm treads and platform sections shape around valves, intakes and openings. The measured span, tide clearance and fittings decide the mix.
What finish handles a salt-spray walkway?
Grit-embedded top for walkways and treads where spray keeps feet damp; concave dished sections shed runoff on ledges; keep smooth panels for dry sheltered coastal points. Match the opening to site footwear.
How are edges and fixings protected in the splash band?
Sections bed on the neoprene strip; matching clips fasten bars to bearers and corners with fasteners isolated from dissimilar metal. Cut edges and holes are sealed within 24 hours; end and side gaps follow the node drawing.
What marine damage should be reviewed on a coastal deck?
Dulled or whitened skin, salt crystals in mesh, loose roving at edges, lifted seal, film on fixings or panel movement on bearers should be flagged for engineering review; a laminate opened to the glass needs assessment, not a surface coat.