Quality Control

In-House Laboratory and Test Capability

Which checks happen inside the plant, which go to a third-party laboratory, and what the buyer receives as evidence for each.

The checks that happen inside the plant

Four checks are done in house on every order: incoming resin documentation, dimensional inspection, cure and surface assessment, and a load or deflection check where the order calls for it. Each is recorded against the batch, not against the day.

Recording against the batch is what makes a complaint traceable. If a panel is soft or a pitch has drifted, the batch record shows which resin lot and which production run it came from.

CheckMethod
Resin documentationBatch certificate checked against the specified grade
DimensionalTape and caliper per bundle, both directions, diagonals for squareness
CureHardness and tack assessment on sampled panels
SurfaceVisual and rub check on grit or concave surface
Edge sealingVisual check on every cut and drilled edge

Dimensional inspection, in detail

Length and width are measured on sampled panels from each bundle. Squareness is checked by comparing the two diagonals, because a squareness error is what produces a visible gap at a joint or a panel that will not drop into a frame.

Bar pitch is measured across ten bars rather than one, so a drift is visible. Bar depth is measured at three points per bar. Open area is checked against the specified figure, 40% or 60% for pultruded sections and the mesh figure for molded.

Load and deflection checks

Where a project specifies a load case, we can set the panel on bearers at the specified span and measure deflection under stepped loading, recording the deflection at each step. This is a check against a stated case, not a certification of a load table.

If a witnessed test is required, it is written into the order with the rig, the load steps and the acceptance deflection agreed in advance. That is the only way a test result means anything to a third party.

What goes to a third-party laboratory

Fire performance and salt spray or chemical exposure testing are carried out by SGS or Intertek rather than in house, because those need accredited facilities and the report has to be independent to be useful.

The consequence is a lead time. If your project needs a specific test on a specific section, raise it at the enquiry stage rather than after production, because a new test cannot be retro-fitted to a finished order.

What the buyer receives

With the order: the packing list with bundle markings, the dimensional inspection sheet, resin batch certificates, and the load table for the section supplied. On request: certificate and third-party report copies, and photographs of the load before the container is sealed.

What we do not issue is a generic certificate of quality covering every panel ever produced. If a document is needed, it is specified in the order and produced for that order.

The limits, stated plainly

We cannot test a property for which no test method has been agreed, and we cannot certify a section we did not produce. Where a buyer needs a figure we have not tested, the answer is a new test with a stated method, not an interpolated number.

Saying this is part of the service. A supplier that promises every figure on request is telling you something about its paperwork, not about its product.

Related pages

FAQ

Do you test load capacity in house?
Where a project specifies a load case, we can set the panel at that span and measure deflection under stepped loading. That is a check against a stated case, not a certification of a load table.
Which tests go to a third-party laboratory?
Fire performance and salt spray or chemical exposure testing, because they need accredited facilities and an independent report.
What documents come with a shipment?
Packing list with bundle markings, dimensional inspection sheet, resin batch certificates, and the load table for the section supplied.
How is squareness checked?
By comparing the two diagonals of the panel. A difference beyond the agreed tolerance shows as a gap at joints or a panel that will not fit a frame.
Can a test be added after production?
Not usefully. A new test has to be agreed before production, with the rig, load steps and acceptance criteria fixed in the order.
Do you issue a general certificate of quality?
No. Documents are specified per order. A generic certificate covering everything produced is not evidence of anything specific.

Document Preview

Preview mode · For full document, click Download

Download Document

Thank you for your interest. Please fill in your email and company name. Our technical and sales team will contact you within 30 minutes (during working hours) to provide support!

📧 Your information will be sent to [email protected]. We respect your privacy and will never share your data.

Thank You!

Your request has been received successfully.

Our technical and sales team will contact you within 30 minutes (during working hours) to provide the document and professional support!

If you need urgent assistance, please email: [email protected]